Titan Wind Energy
Titan Wind Operational Support
Titan Germany
Home
Projects
Om os
Historie
Titans Strategi
Certifikater
What we offer
Kontakt
Job
We handle
many projects around europe.
View a few examples here.
Operational Support at site
Titan have over the last many years been on a lot of exiting projects in different countries such as Sweden, Norway, France,
Yaw teeth repair
Titan is repairing the yaw ring (teeths) on Wind turbines both on- and offshore.The photos shows before and after including the
September 2021
Do you remember the Vestas V29 Tower?We have just refurbished one. The Tower is from the beginning of the 1990sTalking about
July 2021
Once again, we have delivered Vibration Dampers for Towers. The Dampers are tailormade, and works with friction plates for
June 2021
Titan Operational Support's rolling machine worked to the limit, when rolled these 160 mm plates for our customer R-D
May 2021 - 2
Our two painting cabins are each 45 meter long. Here one cabin fully booked with 44 meter blades for a repowering
May 2021
Powder Welding is one of Titan Operational Support's core competencies and we have been involved in rolling and welding two
April 2021
Titan Operational Support have manufactured, done Quality Control (NDT) and painted this Tower Adaptor for our customer Enabl
March 2021
Titan Operational Support have helped NemByg with extension of an existing warehouse at BioRefine Denmark, Nybro. The task have
February 2021
Titan Operational Support have refurbished 8 steel foundations for onshore WTGs.They have been grinded, welded and NDT checked.
January 2021
Titan Operational Support have again helped a customer with repair of a transport damage of a tower section in Sweden. The job
November 2020
Titan have produced and painted 2 big crane pedestals for customer.The customer have been really satisfied with the whole
June 2020
Titan have contributed with extreme heavy and complex steel structures for the LORC project at Lindø.To produce these components
September 2019
Titan Wind surface treatment facility in Esbjerg ready to handle all kinds of surface treatment and assembly task on smaller and
August 2019
Titan Wind Energy (Europe) A/S have finalized their part of the project by producing and delivering 90 mast, 80 monopiles and 10
March 2019
Titan Wind delivered 3 suction piles in ø5500 to Nicon Industries. The piles is to be used for testing installation of offshore
December 2018
Titan Wind just finalized and delivered a Mock-up section to BoConsulting used for testing platform-assembly on MHI
August 2018
Titan Wind finalized two tower adaptors for our new customer R&D Steel A/S. Furthermore, our certificates have been upgraded
Vi arbejder over hele europa
Kontakt os for et tilbud eller hør hvordan vi kan hjælpe dig
+45 70 70 71 50